Construction & Engineering Projects

13,500 Ltrs. Fuel Storage Tank with GPI Fuel Transfer Pump

Water Front

Completed in - July 2017

Subcontracted to Hyundai-Keangnam-Nawaloka Joint Venture

Client requirement – to fabricate 13,500 Ltrs. above ground fuel storage tank with GPI 230V Super-Heavy-Duty Dispenser Pump

Special pointouts of the Project
  • Fabrication of 13,500 Ltrs. above ground storage tank
  • Supply and installation of GPI A/C 230v heavy duty dispenser pump
  • Protective steel box cover for dispenser pump

Other Construction & Engineering Projects