22,500 Ltrs. Above Ground Fuel Storage Tank with Pump and Meter on Steel Pedestal

SLIIT - Malabe Campus

Completed in - June 2022

Fabrication of 5000IG. (22,500 Ltrs.) Aboveground Fuel Storage Tank with PIUSI Fuel Transfer Pump (ITALY) with PIUSI K33Flow Meter, Fuel pipelines and Civil Works.

Special pointouts of the Project
  • Fabrication of 22,500 Ltrs. Above Ground Fuel Storage Tank with Steel Pedestal
  • Supply and Installation of PIUSI Panther 56 Fuel Pump with PIUSI K33 Mechanical Meter
  • Civil Works for Construction of Secondary Containment Pit
  • Supply of 2" Diesel Unloading Transfer Pump (Locally Modified)
  • Supply of 02 nos. Green Hose and Fittings Assembly for 2" Fuel Transfer Pump With Steel Bed
  • Electrical Panel and Wiring for Fuel Pumps
  • Supply and Installation of Complete Fuel Hose Set with Auto Nozzle