Other Private Sector Projects

22,500 Ltrs. Aboveground Fuel Storage Tank with Pump & Flow Meter

Derana Power House Limited

Completed in - February 2022

Fabrication of 5000IG Aboveground Fuel Storage Tank with Supply and Installation of Fill-Rite 230V Fuel Transfer Pump and Meter (USA).

Special pointouts of the Project
  • Fabrication of 22,500Ltrs. Aboveground Fuel Storage Tank
  • Fabrication of Angle Iron Steel Pedestal
  • Supply & Installation of Fill-Rite (701) 230V AC Pump and Flow Meter (USA) with Nozzle and Hose
  • Fabrication of Pump Covering Box

Other Other Private Sector Projects